Planned Maintenance Procedures for Live Networks

Planned Maintenance Procedures for Live Networks

Taking a backbone node offline for maintenance - whether for firmware updates, hardware replacement, or antenna adjustments - affects the users routing through it. With proper planning, that impact can be reduced to a brief interruption rather than a prolonged outage. This page describes a repeatable maintenance procedure for Meshtastic backbone nodes in active community networks.

Pre-Maintenance Checklist

Complete these steps before any planned maintenance window:

During Maintenance

Where possible, power down gracefully rather than performing a hard power-off. A graceful shutdown lets the node stop transmitting cleanly and avoids cutting off a packet mid-transmission or corrupting the node's stored configuration during a flash or write. For solar-powered nodes, the practical approach is to disconnect the load output of the charge controller rather than physically unplugging the node in the dark.

Perform the maintenance task - firmware flash, hardware swap, antenna replacement - as quickly as practical. Every additional minute of downtime increases the chance of a user encountering a failed message delivery.

Post-Maintenance Verification

Before declaring the node returned to service, verify it from multiple directions:

  1. Send a test message from a node that previously routed through the maintained node and confirm delivery.
  2. Run traceroutes from multiple directions to confirm the node is routing normally.
  3. If you run a monitoring system (for example MQTT/Grafana or a third-party map such as meshmap.net), confirm it shows the node online AND recently active. Note that seeing a node online is necessary but NOT sufficient - a node can appear up while failing to relay (for example, wrong role or rebroadcast mode). Always also complete step 1 (a real test message routed through the node) before declaring it back in service.
  4. Update your network maintenance log with the date, work performed, and any configuration changes.

Emergency Rollback Procedure

If a replacement node does not work as expected - wrong firmware, hardware fault, or configuration error - act quickly. Restore the original node if it is still functional, or connect a known-good spare configured to match the original settings. If neither is possible, notify the community immediately that the outage is extended and provide an estimated restoration time. For any network used in emergencies, keep at least one spare node per critical site, PRE-CONFIGURED to match that site (role, channel/PSK, hop limit, fixed position). An unconfigured spare is not a substitute - configuring on-site under incident pressure wastes the very time the spare was meant to save.

After any unplanned extended outage, conduct a brief post-incident review: what failed, why, and what process change would prevent recurrence. Even a one-paragraph note in the maintenance log is valuable for future operators.